Energy performance is a result,
not a promise
Savings are calculated with the similar-day comparison method of GB/T 31349-2014, keeping the pre/post operating data and the calculation report, and third-party re-testing is welcome. Only a selection of references is published here; further projects are under client confidentiality.
Four projects,
four system architectures

Ningbo Lishe International Airport, T2
3×1500 RT + 1×700 RT centrifugal chillers, 3×2.8 MW boilers. Two BAS merged, pumps retrofitted with VFDs, four AI strategies commissioned.
Raffles City Ningbo
5×800 RT + 1×250 RT chillers, 8 cooling towers. Johnson Controls BAS integrated, primary pumps on VFDs, tower staging self-learning.
Zhaoxiang Yangtze River Delta Tech Park
A 250,000 m² campus plant on one platform with AI strategy, combining remote and on-site operation. Plant EER holds above 5.0.
Yangjie Electronics, Yangzhou
Existing BAS integrated and an AI engine added — 20% of plant energy removed while the plant still meets process conditions.
More sectors than
we can list here
The same system types have been delivered across different businesses. Below is a selection of publishable references; projects under client confidentiality are not listed.
Listed names are cleared for publication. Other projects are not disclosed under NDA; anonymised calculation reports can be shared for similar systems.
What could your plant reach?
Comparable systems land between 14.5% and 28%. We measure where your plant sits first, then agree a target that can be verified.